Construction Today - December 2017 - 105

Aerial view of the recently reconstructed ramp over
Interstate 76. The bridge that is being replaced can
be seen to the right, with demolition under way.

element of the original design resulting in
multimillion dollars in savings."
TRC Solutions, a New Jersey-based worldwide engineering, consulting and construction management firm providing integrated services to the power, oil and gas,
environmental and infrastructure markets,
was also involved in the work of the Direct
Connection project. "TRC's expertise in pile
driving analytics provided Conti with valuable pre-planning analysis as well as real
time testing and results during execution,"
Kerrigan says.

«

Long-Awaited
Conti restricted loud construction activities
to designated timeframes to limit disturbing nearby neighborhoods and visitors to
an adjacent cemetery. It designed and constructed an embankment system to prevent
movement in the cemetery.
Once the new overpass is complete, it
will provide three to five new travel lanes
on Interstate 295 in both directions to cross
Interstate 76 and Route 42 at speeds of 55
miles per hour to relieve congestion.
NJDOT has been developing and ana-

lyzing alternative ramp configurations for
Interstate 295 for years. It wanted Interstate
295 traffic to travel directly over the interchange without the need for lane changes
or exit ramps. The effort put forth between
NJDOT and its contractors is monumental
compared to other NJDOT projects and represents one of the largest investments into
the infrastructure in South Jersey.
TRC Solutions TRC, a global engineering,
environmental consulting and construction
management firm, is assisting Conti Enterprises on the I-295/I-76/Route 42 Interchange
project in New Jersey by performing pile dynamic analysis (PDA) testing of the foundation
piles for five bridges. TRC provided wave equation analysis studies to predict pile driving
conditions and performed PDA testing based
on Conti's aggressive scheduling needs, day
or night. TRC is excited to be involved in this
award-winning project, which will dramatically
improve safety and reduce traffic at this busy
interchange. With 120 offices worldwide, TRC
provides integrated services to the energy,
environmental, infrastructure and pipeline
services markets.

105

DECEMBER 2017 CONSTRUCTION-TODAY.COM


http://www.CONSTRUCTION-TODAY.COM

Table of Contents for the Digital Edition of Construction Today - December 2017

Contents
Construction Today - December 2017 - Cover1
Construction Today - December 2017 - Cover2
Construction Today - December 2017 - 1
Construction Today - December 2017 - Contents
Construction Today - December 2017 - 3
Construction Today - December 2017 - 4
Construction Today - December 2017 - 5
Construction Today - December 2017 - 6
Construction Today - December 2017 - 7
Construction Today - December 2017 - 8
Construction Today - December 2017 - 9
Construction Today - December 2017 - 10
Construction Today - December 2017 - 11
Construction Today - December 2017 - 12
Construction Today - December 2017 - 13
Construction Today - December 2017 - 14
Construction Today - December 2017 - 15
Construction Today - December 2017 - 16
Construction Today - December 2017 - 17
Construction Today - December 2017 - 18
Construction Today - December 2017 - 19
Construction Today - December 2017 - 20
Construction Today - December 2017 - 21
Construction Today - December 2017 - 22
Construction Today - December 2017 - 23
Construction Today - December 2017 - 24
Construction Today - December 2017 - 25
Construction Today - December 2017 - 26
Construction Today - December 2017 - 27
Construction Today - December 2017 - 28
Construction Today - December 2017 - 29
Construction Today - December 2017 - 30
Construction Today - December 2017 - 31
Construction Today - December 2017 - 32
Construction Today - December 2017 - 33
Construction Today - December 2017 - 34
Construction Today - December 2017 - 35
Construction Today - December 2017 - 36
Construction Today - December 2017 - 37
Construction Today - December 2017 - 38
Construction Today - December 2017 - 39
Construction Today - December 2017 - 40
Construction Today - December 2017 - 41
Construction Today - December 2017 - 42
Construction Today - December 2017 - 43
Construction Today - December 2017 - 44
Construction Today - December 2017 - 45
Construction Today - December 2017 - 46
Construction Today - December 2017 - 47
Construction Today - December 2017 - 48
Construction Today - December 2017 - 49
Construction Today - December 2017 - 50
Construction Today - December 2017 - 51
Construction Today - December 2017 - 52
Construction Today - December 2017 - 53
Construction Today - December 2017 - 54
Construction Today - December 2017 - 55
Construction Today - December 2017 - 56
Construction Today - December 2017 - 57
Construction Today - December 2017 - 58
Construction Today - December 2017 - 59
Construction Today - December 2017 - 60
Construction Today - December 2017 - 61
Construction Today - December 2017 - 62
Construction Today - December 2017 - 63
Construction Today - December 2017 - 64
Construction Today - December 2017 - 65
Construction Today - December 2017 - 66
Construction Today - December 2017 - 67
Construction Today - December 2017 - 68
Construction Today - December 2017 - 69
Construction Today - December 2017 - 70
Construction Today - December 2017 - 71
Construction Today - December 2017 - 72
Construction Today - December 2017 - 73
Construction Today - December 2017 - 74
Construction Today - December 2017 - 75
Construction Today - December 2017 - 76
Construction Today - December 2017 - 77
Construction Today - December 2017 - 78
Construction Today - December 2017 - 79
Construction Today - December 2017 - 80
Construction Today - December 2017 - 81
Construction Today - December 2017 - 82
Construction Today - December 2017 - 83
Construction Today - December 2017 - 84
Construction Today - December 2017 - 85
Construction Today - December 2017 - 86
Construction Today - December 2017 - 87
Construction Today - December 2017 - 88
Construction Today - December 2017 - 89
Construction Today - December 2017 - 90
Construction Today - December 2017 - 91
Construction Today - December 2017 - 92
Construction Today - December 2017 - 93
Construction Today - December 2017 - 94
Construction Today - December 2017 - 95
Construction Today - December 2017 - 96
Construction Today - December 2017 - 97
Construction Today - December 2017 - 98
Construction Today - December 2017 - 99
Construction Today - December 2017 - 100
Construction Today - December 2017 - 101
Construction Today - December 2017 - 102
Construction Today - December 2017 - 103
Construction Today - December 2017 - 104
Construction Today - December 2017 - 105
Construction Today - December 2017 - 106
Construction Today - December 2017 - 107
Construction Today - December 2017 - 108
Construction Today - December 2017 - 109
Construction Today - December 2017 - 110
Construction Today - December 2017 - 111
Construction Today - December 2017 - 112
Construction Today - December 2017 - Cover3
Construction Today - December 2017 - Cover4
http://digital.construction-today.com/nxtbooks/knighthouse/ct_vol17issue5b
http://digital.construction-today.com/nxtbooks/knighthouse/ct_vol17issue5a
http://digital.construction-today.com/nxtbooks/knighthouse/ct_vol17issue4
http://digital.construction-today.com/nxtbooks/knighthouse/ct_vol17issue4a
http://digital.construction-today.com/nxtbooks/knighthouse/ct_vol17issue3
http://digital.construction-today.com/nxtbooks/knighthouse/ct_vol17issue3a
http://digital.construction-today.com/nxtbooks/knighthouse/ct_vol17issue2
http://digital.construction-today.com/nxtbooks/knighthouse/ct_vol17issue2a
http://digital.construction-today.com/nxtbooks/knighthouse/ct_vol17issue1
http://digital.construction-today.com/nxtbooks/knighthouse/ct_vol17issue1a
http://digital.construction-today.com/nxtbooks/knighthouse/ct_vol16issue6
http://digital.construction-today.com/nxtbooks/knighthouse/ct_vol16issue5
http://digital.construction-today.com/nxtbooks/knighthouse/ct_vol16issue4
http://digital.construction-today.com/nxtbooks/knighthouse/ct_vol16issue3
http://digital.construction-today.com/nxtbooks/knighthouse/ct_vol16issue2
http://digital.construction-today.com/nxtbooks/knighthouse/ct_vol16issue1
http://digital.construction-today.com/nxtbooks/knighthouse/ct_201712
http://digital.construction-today.com/nxtbooks/knighthouse/ct_201711
http://digital.construction-today.com/nxtbooks/knighthouse/ct_20170910
http://digital.construction-today.com/nxtbooks/knighthouse/ct_20170708
http://digital.construction-today.com/nxtbooks/knighthouse/ct_201706
http://digital.construction-today.com/nxtbooks/knighthouse/ct_201705
http://digital.construction-today.com/nxtbooks/knighthouse/ct_20170304
http://digital.construction-today.com/nxtbooks/knighthouse/ct_201702
http://digital.construction-today.com/nxtbooks/knighthouse/ct_201701
http://digital.construction-today.com/nxtbooks/knighthouse/ct_20161112
http://digital.construction-today.com/nxtbooks/knighthouse/ct_201610vol2
http://digital.construction-today.com/nxtbooks/knighthouse/ct_201610
http://digital.construction-today.com/nxtbooks/knighthouse/ct_201609
http://digital.construction-today.com/nxtbooks/knighthouse/ct_201608
http://digital.construction-today.com/nxtbooks/knighthouse/ct_201607
http://digital.construction-today.com/nxtbooks/knighthouse/ct_201606
http://digital.construction-today.com/nxtbooks/knighthouse/ct_201605
http://digital.construction-today.com/nxtbooks/phoenix/ct_201604
http://digital.construction-today.com/nxtbooks/phoenix/ct_20160304
http://digital.construction-today.com/nxtbooks/phoenix/ct_20160102
http://digital.construction-today.com/nxtbooks/phoenix/ct_20151112
http://digital.construction-today.com/nxtbooks/phoenix/ct_20150910
http://digital.construction-today.com/nxtbooks/phoenix/ct_20150708
http://digital.construction-today.com/nxtbooks/phoenix/ct_20150506
http://digital.construction-today.com/nxtbooks/phoenix/ct_20150304
http://digital.construction-today.com/nxtbooks/phoenix/ct_20150102
http://digital.construction-today.com/nxtbooks/phoenix/ct_20141112
http://digital.construction-today.com/nxtbooks/phoenix/ct_20140910
http://digital.construction-today.com/nxtbooks/phoenix/ct_20140708
http://digital.construction-today.com/nxtbooks/phoenix/ct_20140506
http://digital.construction-today.com/nxtbooks/phoenix/ct_20140304
http://digital.construction-today.com/nxtbooks/phoenix/ct_20140102
http://digital.construction-today.com/nxtbooks/phoenix/ct_20131112
http://digital.construction-today.com/nxtbooks/phoenix/ct_20130910
http://digital.construction-today.com/nxtbooks/phoenix/ct_20130708
http://digital.construction-today.com/nxtbooks/phoenix/ct_20130506
http://digital.construction-today.com/nxtbooks/phoenix/ct_20130304
http://digital.construction-today.com/nxtbooks/phoenix/ct_20130102
http://digital.construction-today.com/nxtbooks/phoenix/ct_20121112
http://digital.construction-today.com/nxtbooks/phoenix/ct_20120910
http://digital.construction-today.com/nxtbooks/phoenix/ct_201208
http://digital.construction-today.com/nxtbooks/phoenix/ct_201207
http://digital.construction-today.com/nxtbooks/phoenix/ct_201206
http://digital.construction-today.com/nxtbooks/phoenix/ct_201205
http://digital.construction-today.com/nxtbooks/phoenix/ct_201204
http://digital.construction-today.com/nxtbooks/phoenix/ct_201203
http://digital.construction-today.com/nxtbooks/phoenix/ct_201202
http://digital.construction-today.com/nxtbooks/phoenix/ct_201201
http://digital.construction-today.com/nxtbooks/phoenix/ct_201112
http://digital.construction-today.com/nxtbooks/phoenix/ct_20111011
http://digital.construction-today.com/nxtbooks/phoenix/ct_201109
http://digital.construction-today.com/nxtbooks/phoenix/ct_201108
http://digital.construction-today.com/nxtbooks/businessmedia/ct_201107
http://digital.construction-today.com/nxtbooks/businessmedia/ct_201106
http://digital.construction-today.com/nxtbooks/businessmedia/ct_201105
http://digital.construction-today.com/nxtbooks/businessmedia/ct_201104
http://digital.construction-today.com/nxtbooks/businessmedia/ct_201103
http://digital.construction-today.com/nxtbooks/businessmedia/ct_201102
http://digital.construction-today.com/nxtbooks/businessmedia/ct_201101
http://digital.construction-today.com/nxtbooks/businessmedia/ct_201012
http://digital.construction-today.com/nxtbooks/businessmedia/ct_201011
http://digital.construction-today.com/nxtbooks/businessmedia/ct_201010
http://digital.construction-today.com/nxtbooks/businessmedia/ct_201009
http://digital.construction-today.com/nxtbooks/businessmedia/ct_201008
http://digital.construction-today.com/nxtbooks/businessmedia/ct_201007
http://digital.construction-today.com/nxtbooks/businessmedia/ct_201006
http://digital.construction-today.com/nxtbooks/businessmedia/ct_201005
http://digital.construction-today.com/nxtbooks/businessmedia/ct_201004
http://digital.construction-today.com/nxtbooks/businessmedia/ct_201003
http://digital.construction-today.com/nxtbooks/businessmedia/ct_201002
http://digital.construction-today.com/nxtbooks/businessmedia/ct_201001
http://digital.construction-today.com/nxtbooks/schofield/ct_200912
http://digital.construction-today.com/nxtbooks/schofield/ct_200911
http://digital.construction-today.com/nxtbooks/schofield/ct_200910
http://www.nxtbook.com/nxtbooks/schofield/ct_200909
http://www.nxtbookMEDIA.com